Fulton Hogan deliver paving efficiency at Wellington Airport

Wellington Airport’s apron taxiway was set to undergo major reconstruction for the first time since the airport opened in 1959. The apron taxiway consists of the paved area between the runway and the airport terminal. This area had reached the end of its design life and needed to be resurfaced to ensure the ongoing safety… Continue reading Fulton Hogan deliver paving efficiency at Wellington Airport